Finden Sie Seifenschalenform, Formenbauer, Hersteller Von Seifenschalenformwerkzeugen auf Industry Directory, zuverlässige Hersteller / Lieferant / Fabrik aus China

Anfrage-Korb (0)
Home > Produkt-Liste > Rohstoffform > Ware > Spritzguss-Kunststoff mop Eimer Schimmel

Spritzguss-Kunststoff mop Eimer Schimmel

Lieferzeit: 40 Tage

Basisinformation

Modell: JMT bucket MOULD

Produktbeschreibung

Technische Daten

Mop Eimer Schimmel
1.die Mould Base: LKM, HASCO
2.Cavity:Single/muti
3.Runner:Cold / hot
4. Design Software: UG, PROE

 

Wir sind im Formenbau Chinatown für den Spritzguss

 

Kunststoffeimer Schimmel

 

 

 

Produkt-Beschreibung

 

 

Name            Plastic bucket mould                                                                         
Runner           Cold runner. Hot runner: Yudo/DME/HASCO
Machine            80-1600T
Standard           HASCO, DME, LKM
Specification drawings           Pro/E, Auto CAD, Solidwork, CAXA UG, CAD/CAM/CAE.
Precision machining           CNC, milling machine, drilling machine, numerical lathe, all types of lathe
Surface finish process           polishing, sand blasting, heat treatment, painting, powder coating,                           anodizing, electroplating, mirror polish
Shaping mould                           injection mould
Mould life           above 500000-1000000 shots and up
Service           OEM service available, good after-sales service .
Lead time            4-7 weeks, 40 days or according to the real situation .
Mould  material                P20 steel, 718, 2738, H13, NAK80, 2344, 2343, S136, etc . 
 
 
 
 
 
 
 
 
 
 
Unsere Dienstleistungen

 

 

JMT - Mould Handelsprozess:

 

1.Quote

According to sample, drawing and specific requirement.

          ↓

2.Discussion

Mold material, cavity number, price, runner, payment, etc.

          ↓

3.S/C Signature

Approval for all the items

          ↓

4. Advance

Pay 50% by T/T

          ↓

5.Product Design Checking

We check the product design. If some position is not perfect, or can not be done on the mould, we will send customer the report

          ↓

 



6.Mold Tooling

We start to make mold after mold design confirmed

          ↓

7.Mold Processing

Send report to customer once each week

          ↓

8.Mold Testing

Send trial samples and try-out report to customer for confirmation.

          ↓

9. Mold Modification

According to customer's feedback

          ↓ 

 

10.Balance settlement

50% by T/T after the customer approved the trial sample and mould quality.

          ↓ 

 

11.Delivery

Delivery by sea or air. The forwarder can be designated by your side.

 

 

 

 

 

Informationen zum Unternehmen

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Häufig gestellte Fragen

 

 

F: Was ist Ihr Begriff Handel?
A: in der Regel FOB Ningbo

F: Was ist Ihre Zahlungsbedingung?
A:50 % Anzahlung gegen Auftragsbestätigung, Wägen 50 % Zahlung vor Lieferung.

F: Was ist Ihre Lieferzeit?
A: in der Regel 40 ~ 90Tage, hängt von Ihren Projekten.




Sollten Sie keine Kunststoff-Formenbau-Projekte haben,
Willkommen beim Einsenden von 2D/3D Dateien und Spezifikation,
Wir werden unsere besten Konditionen für Sie ASAP zitieren!
Und wir sind bereit, Ihnen bestmöglichen Service zu bieten, zu jeder Zeit!

Produktgruppe : Rohstoffform > Ware